San Francisco Water Treatment Facility Retrofit Design, $30M- San Francisco, CA

•   Evaluation of Existing Concrete Shear Wall Facility per ASCE 41

San Francisco Airport Temporary Terminal 1 Boarding Area B, $50M- San Francisco, CA

•    Designed Buckling Restrained Brace Frame (BRBF) for lateral system of connector bridge

San Francisco Moscone Convention Center Expansion, $500M - San Francisco, CA

•   Designed New North Building Addition

•   Designed New East Bridge spanning across Howard Street connecting North and South Moscone

Oakland Unified School District Central Kitchen Commissary, $25M – Oakland, CA

•    Design Special Reinforced Concrete Tilt-up Shear Wall lateral system

•    Collaborated closely with the architect which led to timely approval through DSA process

Haight Street Commercial/Residential Building Soft Story Retrofit, $150k – San Francisco, CA

•   Soft Story Seismic Retrofit Design using FEMA P807

San Francisco Public Safety Building, $165M – San Francisco, CA:

•   Designed Buckling Restrained Brace Frame (BRBF), the steel gravity system and foundations